argunix

nixosConfigurations.lewis

← eval #36

system
x86_64-linux
status
success
started
2026-07-02 21:17:44 UTC
finished
2026-07-02 21:17:51 UTC
total
7s
derivation
/nix/store/pv8ppm3xpw3xh38zmcln821gpn9jdy5n-nixos-system-lewis-26.05.20260630.95ca1e2.drv
output
/nix/store/gqqsv1b9fyg64iaz2db55vl2hc25a492-nixos-system-lewis-26.05.20260630.95ca1e2

transport & build

Time and data spent uploading the build inputs to the builder, running the build, and downloading the outputs back. Bytes are measured between argunix and the builder; the build duration is the build itself, not including transfer.

phase duration bytes
push (drv closure → builder) 965 ms 1.06 MB
build (net, on builder) 4s
pull (output closure ← builder) 1s 1.86 MB

view build log