argunix

nixosConfigurations.lewis

← eval #37

system
x86_64-linux
status
success
started
2026-07-02 21:28:40 UTC
finished
2026-07-02 21:28:51 UTC
total
10s
derivation
/nix/store/7d1fgz13p315z413lkm1ayr7swc3295c-nixos-system-lewis-26.05.20260630.95ca1e2.drv
output
/nix/store/wh7cyh0zs30zib0bwmd7vscll76ccij2-nixos-system-lewis-26.05.20260630.95ca1e2

transport & build

Time and data spent uploading the build inputs to the builder, running the build, and downloading the outputs back. Bytes are measured between argunix and the builder; the build duration is the build itself, not including transfer.

phase duration bytes
push (drv closure → builder) 939 ms 1.06 MB
build (net, on builder) 5s
pull (output closure ← builder) 3s 1.86 MB

view build log