argunix

nixosConfigurations.atlas

← eval #8

system
x86_64-linux
status
success
started
2026-06-27 09:47:45 UTC
finished
2026-06-27 09:47:51 UTC
total
5s
derivation
/nix/store/lz16hga39znfdv2761wnxn2zs2jxqslf-nixos-system-atlas-26.05.20260611.a037402.drv
output
/nix/store/ibg6nvk1hqp20ps9icppg7w82xxpdyy2-nixos-system-atlas-26.05.20260611.a037402

transport & build

Time and data spent uploading the build inputs to the builder, running the build, and downloading the outputs back. Bytes are measured between argunix and the builder; the build duration is the build itself, not including transfer.

phase duration bytes
push (drv closure → builder) 1s 1.26 MB
build (net, on builder) 3s
pull (output closure ← builder) 954 ms 1.98 MB

view build log