argunix

nixosConfigurations.lewis

← eval #8

system
x86_64-linux
status
success
started
2026-06-27 09:47:45 UTC
finished
2026-06-27 09:47:51 UTC
total
5s
derivation
/nix/store/ik2m245vvsblj00dsia7pvs8fawz47km-nixos-system-lewis-26.05.20260611.a037402.drv
output
/nix/store/07i53fmw4xyqb3amlg3ka3isk4iyy3zx-nixos-system-lewis-26.05.20260611.a037402

transport & build

Time and data spent uploading the build inputs to the builder, running the build, and downloading the outputs back. Bytes are measured between argunix and the builder; the build duration is the build itself, not including transfer.

phase duration bytes
push (drv closure → builder) 961 ms 1.05 MB
build (net, on builder) 3s
pull (output closure ← builder) 993 ms 1.79 MB

view build log