argunix

nixosConfigurations.roeland

← eval #89

system
x86_64-linux
status
success
started
2026-07-12 00:12:23 UTC
finished
2026-07-12 00:12:28 UTC
total
4s
derivation
/nix/store/v8c3yah0nqhdi3winmig2hx0lamk8006-nixos-system-roeland-26.05.20260630.95ca1e2.drv
output
/nix/store/z4g4acw48xj1vcyximkfm673gszgi1gk-nixos-system-roeland-26.05.20260630.95ca1e2

transport & build

Time and data spent uploading the build inputs to the builder, running the build, and downloading the outputs back. Bytes are measured between argunix and the builder; the build duration is the build itself, not including transfer.

phase duration bytes
push (drv closure → builder) 815 ms 1.20 MB
build (net, on builder) 3s
pull (output closure ← builder) 684 ms 1.68 MB

view build log